Construction Case Study

Dust control during new heating installation at bank HQ

11th June 2018


Dust control during new heating installation at bank HQ , RVT Group

Two Raptor units did such an efficient job clearing dust, not only was this site a much healthier place but their cost was largely offset by the savings in cleaning costs.

 

Download more details

 

←  Back to index

Book your free UK wide site assessment