Case Study Overview

The Oracle shopping centre in Reading is currently undergoing a £5.7m redevelopment. Reading Borough Council’s investment in this prominent shopping complex is a two-phase upgrade designed, to transform the mall into a ‘premium leisure destination’.

Challenge

Radius Shopfitters needed an extraction machine to protect their construction crew from harmful exhaust fumes generated from the concrete pump. Without the right equipment to pump the fumes away from the site, the job wouldn’t be able to continue.

Solution

Radius approached RVT to confirm what they needed to keep the project on schedule and to keep the trade workers safe. RVT recommended the Ravex Exhaust Extraction Kit which is perfect for use in enclosed spaces; it diverted the fumes to a safe area outside of the shopping centre, allowing the renovations to continue without interruption.

Client

Radius Shopfitters

Location

Reading

Products Used