CLIMEX® Air Handler Units

Circulates Warm or Cool Air

Static units with three sizing options that can be connected to fluid chillers or heating boilers and facilitate large-scale cooling or heating as a crucial component of a HVAC system.

Cooling

Key Features and Applications

Moves high volumes of air through an easy to control unit to allow climate controls in environments such as in data centres, factories, marquees and more.

Add To Quote
Product Comparison

Comparison Table for CLIMEX® Air Handler Units

CLIMEX® Air Handler Unit 30 - 60
Nominal Cooling 30kW - 60kW 
Nominal Heating N/A 
Airflow 4200m³/hr 
Outlet 3 sided air discharge plenum or optional 500mm duct spigot 
Inlet Via Louvre 
Plug 13amp plug 
Power 230v Single Phase 
Length 1050mm 
Width 500mm 
Height 1700mm 
Weight 140kg 
Download Spec Sheet
CLIMEX® Air Handler Unit 150 - 300
Nominal Cooling 150kW - 300kW 
Nominal Heating 300kW 
Airflow 30060m³/hr 
Outlet 4 off 640mm Diameter 
Inlet 4 off 640mm Diameter 
Plug 5 pin 32a 
Power 415v 3PN & E Full load current 22.6a Start-up current 132a 
Length 3600mm 
Width 2300mm 
Height 2200mm 
Weight N/A 
Download Spec Sheet
CLIMEX® Air Handler Unit 250 - 500
Nominal Cooling 250 - 500kW 
Nominal Heating 500kW 
Airflow 20160m³/hr 
Outlet 2 off 600mm Diameter 
Inlet 2 off 600mm Diameter 
Plug 32a 
Power 415v 3PN & E Full load current 22.6a Start-up current 132a 
Length 2260mm 
Width 2110mm 
Height 1700mm 
Weight 934kg 
Download Spec Sheet
NEXT STEPS

Choosing the Right Solution

Whether you need help selecting the right solution for your project or you are ready to place an order, our specialists are here to provide expert advice and support every step of the way.

Step One: Discuss

Contact us in a way that works best for you. Whether you email, telephone or complete an online enquiry form, a member of the team will be ready to help.

Step Two: Plan

Once we know what the challenge is, we'll contact you and recommend an effective hazard control solution that protects your people and keeps your project on track.

Step Three: Execute

When you're ready to place an order, we'll ask you to organise a PO, and we'll take care of the rest. Our service includes providing the RAMS and logistics for any solutions that you have on site. Once delivered, you can rest assured with ongoing technical support, engineer access and superior customer service throughout the hire.

Enquire

Interested in this Product?

If you would like further product information, or you require a quote, please complete the details and a member of our team will respond as soon as possible.

Please complete all form fields marked with an asterisk (*).

Cooling

Related Resources

TESTIMONIALS

Client Experiences that Speak for Themselves

“RVT Group are leaders in raising awareness about health risks, particularly in the construction industry and consistently deliver help to manage these risks”

Bowmer and Kirkland