Sewage Treatment Works (STW) at Chobham, Surrey Heath is involved in the treatment of sewage effluent, utilising biological filtration systems for secondary treatment.
Ongoing upgrades are being implemented to improve the facilities performance and a leading UK contractor were appointed to undertake some remedial works as part of this.
Remedial works required both humus settlement tanks (HSTs) at the facility to be taken temporarily out-of-service. As HSTs are essential components for the separation of solids from treated sewage before discharge, taking them both offline posed a clear risk to suspended solids compliance .
The contractor reached out to RVT Group for a temporary hire solution that would successfully navigate the strict compliance requirements of the wastewater treatment facility, so their team could focus on the remedial works at hand.
RVT Group supplied the contractor with mobile lamella clarification systems to provide interim settlement whilst HSTs were out-of-service.
Treatment performance and throughput were maintained throughout the works, protecting compliance, minimising programme risk, and avoiding disruption to site operations.
Surrey