Construction Case Study

Fume ventilation during Wimbledon upgrade

11th April 2017


Fume ventilation during Wimbledon upgrade , RVT Group
RVT Group
RVT Group

The requirement at iconic Wimbledon All-England Tennis Club to carry out extensive improvements work with no interruption to normal operation, created a need for very specialist ventilation. RVT rose to the challenge and provided a solution which fully protected workers during this top-down excavation.

Watch the top down excavation in action below ...


 

Download the full case study to find out more.

 

Download more details

 

←  Back to index

Book your free UK wide site assessment