Utilities Case Study

Noise control during construction of 3 mile tunnel

14th June 2017


Noise control during construction of 3 mile tunnel, RVT Group

The Shieldhall Tunnel is the largest wastewater tunnel ever built in Scotland. It runs beneath Glasgow. and several ventilation and service shafts rise to ground within residential areas. RVT provided solutions to protect residents from the impact of noise during construction.

 

Download more details

 

←  Back to index

Book your free UK wide site assessment