0808 178 3286

Rail Case Studies

Specific projects. Take a look and always be free to discuss anything that interests you with us.

 

←  All case studies

Ventilation for Chipping Sodbury Tunnel

Maintaining a fresh air supply during electrification works

Read more  →

Major upgrade of Waterloo station

Providing bespoke noise and air quality control solutions

Read more  →

Patchway Tunnel Upgrade

Effective ventilation provided in challenging tunnel with confined space.

Read more  →

Crossrail Fisher Street Site

RVT provides noise control solution for the biggest construction project in Europe

Read more  →

EGIP

RVT Group provides fresh air for the Edinburgh Glasgow Improvement Project

Read more  →

Farnworth Tunnel, Nr Bolton

RVT protects workers’ health during landmark engineering project.

Read more  →

Box Tunnel, Box

Project success at Box Tunnel – British engineering excellence lives on!

Read more  →

Book your free UK wide site assessment  ↓

 

Book your free site assessment using the form below, to identify the hazards and best control solutions for your project.