Construction Case Studies

Specific projects. Take a look and always be free to discuss anything that interests you with us.

 

←  All case studies

Dust and fume extraction in enclosed spaces

Extraction and ventilation solutions during basement excavation in Trafalgar Square

Read more  →

Noise control during hydro demolition in Edinburgh

Protecting workers and pedestrians from noise during lift shaft construction

Read more  →

Heating and drying solutions at a care home development

Keeping wet trades on track and residents warm

Read more  →

Drying solutions for state-of-the-art hospital development

Efficient, economical mobile heaters keeps wet trades on schedule

Read more  →

Temporary heating prevents delays to school extension

Powerful and dependable heaters get rain flooded project back on track

Read more  →

Dust extraction during shot-blasting at business centre

Protecting residents and office workers during brickwork renovation

Read more  →

Speeding up drying times during wet trade work

Indirect oil-fired heaters keep retirement home construction on track

Read more  →

Providing safe air beneath Dover Eastern Docks

Ventilation during repair works to main structure at the docks

Read more  →

Dust containment at historic Law School refurb

Dust extraction during extensive internal demolition and alterations in Edinburgh

Read more  →

Providing ventilation deep underground

Supplying fresh air four storeys beneath Manchester's New Square

Read more  →

Cold weather drying solutions at a retirement home

Powerful portable heating enabled quick-drying of plaster and kept project on track

Read more  →

Noise reduction at Covent Garden redevelopment

Effective noise control during major market up-grade enables business as usual

Read more  →

Cutting site noise at Centre Point transformation

Minimising disruption to neighbours and maximising protection for site operatives with acoustic barriers

Read more  →

Managing air quality during skyscraper construction

Ventilation control during the top-down basement excavation of London's 'Scalpel' building

Read more  →

Fume ventilation during Wimbledon upgrade

Ventilating restricted spaces during top-down basement excavation

Read more  →

Book your free UK wide site assessment