Rail Case Study

Ventilation for Great Western railway tunnel

14th November 2017


Ventilation for Great Western railway tunnel, RVT Group

One of the biggest challenges of the upgrade to the Great Western mainline was the electrification of the line through this tunnel, which is over four kilometres in length. RVT devised a means of ensuring a constant supply of fresh air to the workers in the tunnel.

 

Download more details

 

←  Back to index

Book your free UK wide site assessment