0808 178 3286

Rail Case Study

Ventilation for Chipping Sodbury Tunnel

14th November 2017


Ventilation for Chipping Sodbury Tunnel, RVT Group

One of the biggest challenges of the upgrade to the Great Western mainline was the electrification of the line through this tunnel, which is over four kilometres in length. RVT devised a means of ensuring a constant supply of fresh air to the workers in the tunnel.

 

 

RVT Group PDF

Download more details

 

←  Back to index

Book your free UK wide site assessment  ↓

 

Book your free site assessment using the form below, to identify the hazards and best control solutions for your project.