Utilities Case Study

Large-scale ventilation during tunnel shaft excavation

12th October 2018


Large-scale ventilation during tunnel shaft excavation, RVT Group

RVT Group provided the solution to the challenge of maintaining optimum air quality for site operatives on the Carnwarth Road shaft of the Thames Tideway project, the UK's largest infrastructure project ever undertaken by the UK water industry.

 

Download more details

 

←  Back to index

Book your free UK wide site assessment