The challenge

 

Acheson Construction, the principal contractors, experienced difficulties in getting mains services to the project, and the lack of heating and ventilation became an increasing problem as the winter progressed.

 

Joinery, decorating and floor laying all became hampered by the low temperatures. Humidity levels had also encouraged mould growth around the site.

 

 

The RVT solution

 

RVT's Climex Indirect Oil Fired heating solution was exactly right for this project. RVT assessed the site and installed two of the units outside. These were attached to fans and ducting that pumped and circulated the warm air safely along the corridors.

 