0808 178 3286

Rail Case Study

Patchway Tunnel Upgrade

27th March 2017


Patchway Tunnel Upgrade, RVT Group
RVT Group

Ensuring effective ventilation was critical for the health protection of all workers on the Patchway Tunnel upgrade. Representing a challenging work area with very confined space, air pollutants would easily linger and fresh oxygen would not naturally find its way in.

 

Download the full case study to find out how the challenges were overcome.

 

 

RVT Group PDF

Download more details

 

←  Back to index

Book your free UK wide site assessment  ↓

 

Book your free site assessment using the form below, to identify the hazards and best control solutions for your project.