Marine Case Study

Capturing airborne hazards at a prestigious marina

8th May 2019


Capturing airborne hazards at a prestigious marina, RVT Group

The challenge

Hamble Yacht Services recently refurbished the hull of a 50ft yacht located within the marina. They needed to sand the hull smooth, re-spray it with coating, and then smooth and polish the surface – a major undertaking but one that would see this prestigious yacht restored to its true excellence.

Although Hamble Yacht Services had created a temporary scaffold tent around the yacht, the work carried out would still present two challenges. The first would be to protect those working within the tent from airborne fibreglass; and the second would be to protect people enjoying the marina from the dust and fumes ejected from the enclosure. The project presented certain hazards and RVT was approached for control solutions.




Read the full case study below

 

Download more details

 